Built
All Change at Bank, Courtesy of the City of London Corporation.
The All Change at Bank project reprioritises space for people walking, wheeling and cycling at Bank Junction alongside an enhanced public realm, including seating and greening.
The All Change at Bank project represents a bold move from vehicular dominance to pedestrian priority with narrower carriageways, wider pavements and enhanced areas of public space. The area above Bank Station, once seen as a key vehicle route through the City of London, has become a more inclusive and welcoming space. Following the successful timed bus and cycle only restrictions in 2017, the space has been rebalanced in favour of the large volumes of people walking, wheeling and cycling.
Project information
Status
Built
Borough
City of London
Completion
2024
Location
Bank Station, Underground Ltd, Bank/Monument Complex, Princes St, London EC3V 3LA, UK
Team Credits
Project Manager
Project Engineer
Network Manager
Listed by
Last updated on
27/06/2024
Standard
Standard (small business)
Partner