Under Construction
HB Reavis
HB Reavis acquired Farringdon West’s Crossrail OSD in August 2018. The scheme provides seven storeys of workspace, substantial terraces, retail, fitness studio and generous cycling facilities.
At Bloom Clerkenwell designed by JRA, HB Reavis’ ‘Ready to Work’ concept embraces hybrid working, supporting changes in our work:life balance.
Augmented by Symbiosy technology, it's a ‘live’ workspace, developed with MAA Architects, that can readily change to suit business needs by analysing and controlling the environment from air quality to occupation density, supporting employees’ performance and wellbeing.
Ready to Work offers flexible, simplified leases and fit-out options, reducing upfront costs, removing complexity and enabling scalability for the occupier.
Project information
Status
Under Construction
Borough
Islington
Size
13470 sq m
Completion
May 2021
Location
4 Farringdon Rd, Holborn, London EC1M 3HE, UK
Team Credits
Developer
Architect
Structural Engineer
Listed by
HB Reavis UK Ltd
Last updated on
31/05/2024
Standard
Standard (small business)
Partner