New London Architecture

Greenford Quay

Built

Greenford Quay is a mixed-use 26-acre site, featuring rental, private and affordable homes with extensive amenities and 130,000 sq ft of retail space.

Greenford Quay by Greystar is the UK’s first large-scale, purpose-built rental community located in Greenford, West London. Through meticulous planning, extensive consultation, and transformative initiatives, the project has successfully transformed the former GlaxoSmithKline and Sunblest Bakery sites into a vibrant mixed-use neighbourhood on the banks of the historic Grand Union canal.

Compared to conventional construction, Greystar’s decision to adopt modular construction techniques to deliver the scheme, in partnership with Tide Construction, reduced both construction site traffic and site waste by 80%, and a study by Heriot Watt University demonstrated performance improvements across all 10 environmental indicators and an overall saving of more than 26,000 tonnes of CO2. 

The residential-led masterplan will ultimately deliver 2,188 high-quality homes set within new public realm, featuring bespoke designed build-to-rent, private sale and affordable tenures, bringing together a diverse community. The ground floor levels of buildings are given over entirely to 130,000 sq ft of various commercial uses and community floor space, offering a range of new amenities for residents and the local community.

The Greenford Quay development has gone above and beyond to create new connections throughout the area by reopening Berkeley Avenue and the construction of a new pedestrian bridge over the Grand Union Canal. The has not only improved accessibility and connectivity within Greenford but have also created opportunities for community engagement.

Dan Thompson, Greystar, Managing Director – Development, said:

"Working on the Greenford Quay masterplan has been a rewarding journey. As one of the first purpose designed and multi-phased developments in Build-to-Rent, it presented several new challenges in planning, placemaking and delivery. We worked very hard in creating and sustaining great resident experience from day one, whilst building out the estate. Adopting modular construction methods of delivery has been key in accelerating delivery. It’s been a pleasure to collaborate with an array of stakeholders to develop and integrate this once forgotten part of community back to life."

This project is featured as a case study alongside our Public London: Activating the City insight study. The publication, exhibition and online project directory explore what constitutes a successful and democratic public realm today, the role of co‑creation and partnerships, and how we can ensure that places are fit‑for‑purpose in the long term.
Download the report

Project information

Status

Built

Borough

Ealing

Completion

2023


Team Credits

Developer

Greystar

Architect

HTA

Engineer

Walsh

Project Manager

Cumming Group

Engineer

PSH


Listed by

Greystar

Last updated on

27/06/2024


Stay in touch

Upgrade your plan

Choose the right membership for your business

Billing type:
All prices exclude VAT
View options for Personal membership