Planning Granted
Refurbishing industrial waste buildings at Safeguarded Wharves and Waste Site as part of the world’s largest waste decarbonisation project, shifting to road-to-river operations.
Cory’s new purpose-built industrial waste handling building in Barking forms part of the world’s largest single-site waste decarbonising project. The development modernises an existing Safeguarded Waste Site, refurbishing two Safeguarded Wharves and connecting to Rippleway Wharf and the River Roding for container stacking and barge loading. It transforms waste movement, reducing on-road vehicle traffic and increasing waste through-put capacity at the site.
Standard
Standard (small business)
Partner