New London Architecture

150 Aldersgate

Under Construction

A green retrofit and repositioning of a workplace buidling in Farringdon. Borough: The City of London. Completion Year: 2024 150 Aldersgate St, Barbican, London EC1A 4AB, UK

This 140,000 sqft Workplace project reuses 80% of the existing frame and substructure, saving time and a substantial amount of embodied carbon. The plan ensures flexibility and has 24 gardens and terraces spread over 5,650 sqft. The replacement of existing services with modern and low-energy plant will reduce energy use by 43.5%. A new façade featuring passive shading will substantially reduce the energy consumption of the existing building and provide occupants with enhanced daylight and openings for mixed ventilation.


Project information

Status

Under Construction

Borough

City of London

Size

13000 sq m

Completion

2024


Location

150 Aldersgate St, Barbican, London EC1A 4AB, UK


Team Credits

Architect

Fletcher Priest Architects

Client

Topland

Project Manager

Buro Four

Structural Engineer

AKT II

Quantity Surveyor

Leslie Clarke

Project Manager

Opera


Last updated on

31/05/2024


Stay in touch

Upgrade your plan

Choose the right membership for your business

Billing type:
All prices exclude VAT
View options for Personal membership