Under Construction
Fletcher Priest Archiects
A green retrofit and repositioning of a workplace buidling in Farringdon. Borough: The City of London. Completion Year: 2024 150 Aldersgate St, Barbican, London EC1A 4AB, UK
This 140,000 sqft Workplace project reuses 80% of the existing frame and substructure, saving time and a substantial amount of embodied carbon. The plan ensures flexibility and has 24 gardens and terraces spread over 5,650 sqft. The replacement of existing services with modern and low-energy plant will reduce energy use by 43.5%. A new façade featuring passive shading will substantially reduce the energy consumption of the existing building and provide occupants with enhanced daylight and openings for mixed ventilation.
Project information
Status
Under Construction
Borough
City of London
Size
13000 sq m
Completion
2024
Location
150 Aldersgate St, Barbican, London EC1A 4AB, UK
Team Credits
Architect
Fletcher Priest Architects
Client
Topland
Project Manager
Buro Four
Structural Engineer
AKT II
Quantity Surveyor
Leslie Clarke
Project Manager
Opera
Listed by
Last updated on
13/01/2025