New London Architecture

7 Holbein Place, SW1

Proposed

Grosvenor's proposals include significantly refurbishing this 1980s office building to create a high quality, flexible and sustainable workspace. There will be an extension on the top floor.

No.7 Holbein Place is a 1980s-built office building in need of refurbishment to align it with the needs of office workers and communities today. Grosvenor have submitted a planning application to the Royal Borough of Kensington and Chelsea Council (RBKCC) to create one of London’s most sustainable office buildings. The proposals include refurbishing and extending the building to create a high quality, flexible and sustainable workspace.

Zero Carbon London

Zero Carbon London

→ BREEAM Outstanding
→ 65% reduction of operational carbon saving compared to a typical commercial building
→ 99.5% of strip-out waste diverted from landfill and 98% of full scheme
→ Net Zero operational carbon by 2030
→ WELL and Fitwell Platinum enabled

A 1980s office building in need of refurbishment to align it with the needs of office workers and communities today. Grosvenor have submitted a planning application to RB Kensington and Chelsea to create one of London’s most sustainable office buildings. The proposals include refurbishing and extending the building to create a high quality, flexible and sustainable workspace. The use of biophilia and greening, enhances the site’s biodiversity and ecological resilience, whilst also making a positive contribution to the local neighbourhood from a wellness and social perspective. The scheme also includes some of the industry’s most innovative sustainable products, challenging suppliers on recycled content and recyclability to ensure waste is reduced and diverted away from landfill.

Project information

Status

Proposed

Borough

Westminster

Size

2323 sq m

Completion

September 2022


Location

1 Whittaker St, Belgravia, London SW1W 8JQ, UK


Team Credits

Architect

Barr Gazetas

Structural Engineer

Heyne Tillett Steel

M&E / Sustainability Engineer

Tuffin Ferraby Taylor LLP

Project Manager

Capital & Provincial

Cost Consultant

Leslie Clark

M&E / Sustainability Engineer

Hurley Palmer Flat


Listed by

Grosvenor

Last updated on

31/05/2024


Stay in touch

Upgrade your plan

Choose the right membership for your business

Billing type:
All prices exclude VAT
View options for Personal membership