Under Construction
Secchi Smith
The Barking Energy Centre powers the borough's district heating network, heating over 10,000 homes. This project is a key step towards borough-wide renewable energy use.
Supplying heat to over 10000 homes, The Barking Energy Centre (BEC) is a strategic response to the Council’s recent declaration of a Climate Emergency. Located at the edge of the borough, BEC is a highly visible landmark when entering Barking by road. By architecturally celebrating the building’s function, BEC becomes a landmark of the Low Carbon Energy Network and a signpost of the borough’s aspirations of becoming the Green Capital of the Capital
Project information
Status
Under Construction
Borough
Barking
Size
1035 sq m
Completion
October 2024
Location
108 Cowbridge Ln, Barking IG11 8LH, UK
Team Credits
Architect
Services Engineer
RED
Structural Engineer
Contractor
Ameresco Ltd
Client
B&D Energy
Client Design Advisor
Be First
Listed by
Last updated on
08/07/2024
Standard
Standard (small business)
Partner