Built
Our reworking of Central Cross demonstrates that a few well-placed interventions can make a dramatic difference to the identity of a mixed urban block.
Our work at Central Cross dramatically improves the ground-level retail frontage of an existing building by infilling a previously dark and cluttered colonnade. We felt that well-designed, contemporary shopfronts would contribute to the improved character and appearance of the building and to the conservation area as a whole. The scheme makes a significant contribution to improving an area of public realm within central London by enlivening Newport Place and improving the entrance experience at the eastern end of Chinatown.
Project information
Status
Built
Borough
Westminster
Size
4200 sq m
Completion
June 2017
Location
Newport Ct, West End, London, UK
Team Credits
Architect
Client
Shaftesbury
Structural Engineer
Heyne Tillett Steel
Listed by
Last updated on
31/05/2024
Standard
Standard (small business)
Partner