Built
USM
This 9 storey, 1,477 sq.m, TV studios had ground floor food outlets. In 2014 we erected a smaller version of it at Trinity Buoy Wharf. It is now on 4 floors, providing 12 workspaces over 1,200 sq.m
LOCOG commissioned us to design and build this 9 storey, 1,477 sm space, with ground floor food outlets and 10x TV broadcasting studios above. It was installed in 12 days. We dismantled it immediately after the Games ended. In 2014 we erected a smaller 1,200 sm version at TBW in 5 days. It has 4 floors, providing 12 workspaces which vary from 22 sm creative spaces to the HQ of Thames Clippers with 500 sm of bespoke office space.
Project information
Status
Built
Borough
Tower Hamlets
Size
1200 sq m
Completion
August 2014
Location
64 Orchard Pl, London E14 0JW, UK
Listed by
Last updated on
31/05/2024
Standard
Standard (small business)
Partner