Built
Jim Stephenson
The new steel bridge spans 7m over the dock mouth. To allow passage of vessels into the dock, the bridge is designed to roll over so that the deck becomes inverted.
Project information
Status
Built
Borough
Newham
Completion
2022
Location
Cody Dock, London E16 4TL, UK
Team Credits
Structural Engineer
Architect
Thomas Randall - Page
Other
Cake Industries
Listed by
Last updated on
15/05/2023
Standard
Standard (small business)
Partner