New London Architecture

JLL 20 Water Street

Built

A sustainable, inclusive, health-led, tech-smart, energy-efficient, and flexible workplace. A 100% circular fit-out resulted in zero waste to landfill, asset end-of-life plan and modular design.

The 100% circular fit-out stipulated zero waste to landfill, an end-of-life plan for all assets and modular design. Circular design avoided new materials where possible and used innovative low carbon materials (e.g. post-industrial plastic waste worktops), while 1,244 refurbished/reused furniture items make up 79% of the furniture installation. The project is on track to simultaneously achieve WELL Platinum, BREEAM Excellent and SKA Gold, the first London project and second in the UK to achieve this, following JLL’s Manchester office fit-out.


Project information

Status

Built

Borough

Tower Hamlets

Size

3583 sq m

Completion

April 2022


Location

20 Water St, London E14 9QG, UK


Team Credits

Project Manager

JLL

Interior Designer

Tétris Design x Build

Quantity Surveyor

JLL

M&E Engineer

Hilson Moran

Sustainability Consultant

JLL

Contractor

Tétris Design x Build

Agent

JLL

Building Owner

Canary Wharf Group


Listed by

JLL

Last updated on

31/05/2024


Stay in touch

Upgrade your plan

Choose the right membership for your business

Billing type:
All prices exclude VAT
View options for Personal membership