Built
Jonathan Banks
A sustainable, inclusive, health-led, tech-smart, energy-efficient, and flexible workplace. A 100% circular fit-out resulted in zero waste to landfill, asset end-of-life plan and modular design.
The 100% circular fit-out stipulated zero waste to landfill, an end-of-life plan for all assets and modular design. Circular design avoided new materials where possible and used innovative low carbon materials (e.g. post-industrial plastic waste worktops), while 1,244 refurbished/reused furniture items make up 79% of the furniture installation. The project is on track to simultaneously achieve WELL Platinum, BREEAM Excellent and SKA Gold, the first London project and second in the UK to achieve this, following JLL’s Manchester office fit-out.
Project information
Status
Built
Borough
Tower Hamlets
Size
3583 sq m
Completion
April 2022
Location
20 Water St, London E14 9QG, UK
Team Credits
Project Manager
Interior Designer
Tétris Design x Build
Quantity Surveyor
M&E Engineer
Sustainability Consultant
Contractor
Tétris Design x Build
Agent
Building Owner
Listed by
Last updated on
31/05/2024