Proposed
BDP
Replacement of the John Innes Centre (JIC) and The Sainsbury Laboratory facilities at Norwich Research Park with new next generation infrastructure.
Project information
Status
Proposed
Borough
* N/A Outside of London
Size
34562 sq m
Estimated completion
December 2025
Location
67 Colney Ln, Cringleford, Norwich NR4 7RG, UK
Team Credits
Architect
Structural Engineer
M&E / Sustainability Engineer
Interior Designer
Lighting Designer
Acoustic Consultant
Listed by
Last updated on
08/06/2020
Standard
Standard (small business)
Partner