New London Architecture

Back to Projects

Point Blank

Built

LOM has completed the campus expansion of Point Blank Music School in Hoxton, transforming a Victorian warehouse into a cutting-edge music education facility.

LOM has completed the campus expansion of Point Blank Music School in Hoxton, transforming a Victorian warehouse into a cutting-edge music education facility. Building on a 2016 project, the new 18,000 sq ft fit-out brings the total campus footprint to over 32,000 sq ft, featuring 12 state-of-the-art teaching studios, a performance hub and bar, a library, and student breakout spaces.


Project information

Status

Built

Borough

Hackney

Size

1640 sq m

Estimated completion

September 2024


Location

Penn St, London N1, UK


Team Credits

Architect

LOM architecture and design

Services Engineer

Hydrock, now Stantec

Acoustic Consultant

Hydrock, now Stantec


Last updated on

27/02/2025


BESbswy