Under Construction
Jack Hobhouse
A new campus in Stratford, East London, delivering high-quality student accommodation & an exciting new science facility with flexible, multi-functional space for teaching & experimental laboratories.
The first phase of University College London’s UCL East campus is a transformative science-based project that erodes divisions between research, education and enterprise, and barriers between academics and the public. Around a memorable top-lit atrium that will operate virtually 24/7, is a 3-storey, 5,400 sqm academic space that is easily adaptable. Above the terrace rise two slender towers containing 500 student rooms with large glass-sided ‘observation car’ communal spaces at the ends of the towers with stunning 3-way views.
Project information
Status
Under Construction
Borough
Newham
Size
20000 sq m
Estimated completion
August 2022
Location
London Aquatics Centre (Stop H), London E20 2AQ, UK
Team Credits
Architect
Lifschutz Davidson Sandilands
Client
University College London
Structural Engineer
AKT II
M&E / Sustainability Engineer
Hilson Moran
Cost Consultant
AECOM
Contractor
Vinci
Landscape Architect
Bradley Hole Schoenaich Landscape Architects
Acoustic Consultant
Cole Jarman
Lighting Designer
EQ2
Listed by
Lifschutz Davidson Sandilands
Last updated on
13/01/2025