Tideway: King Edward Memorial Park Foreshore
Under Construction
As part of the Tideway project to upgrade London’s sewer infrastructure, the Foreshore combines massive below-ground structures with an extension of the park above for the local community.
View projectTransport for London: Sustainable Development Framework
Proposed
McGregor Coxall was commissioned to prepare Vibrant Place KPIs, and Healthy Streets and Green Infrastructure Optimisation Briefs for 20 development sites centred around public transport interchanges.
View projectProposed
The Castlefield Viaduct Vision incorporates gardens that are a mix of National Trust planting and plots designed and grown by community organisations.
View projectLiverpool Street Station: Elizabeth Line
Built
The design comprises two platform tunnels stretching 245m connecting Moorgate and Liverpool Street Stations as well as new ticket halls and escalator boxes to street level.
View projectUnder Construction
The refurbishment of James Riley Point (JRP) reinvents this 23-storey vacant residential tower set within a triangular site of poorly structured landscape.
View projectStandard
Standard (small business)
Partner