New London Architecture

City Place House

Proposed

A grade A commercial space will be developed at a prominent location at heart of City, where a 40 years old outdated building currently sits.
Zero Carbon London

Zero Carbon London

→ Targeting Embodied carbon 500 kgCO2e/m2
→ Targeting BREEAM Outstanding
→ Targeting WELL
→ Targeting 45% reduction in regulated CO2 emissions
→ Targeting 45–50% reduction in potable water consumption

A grade A commercial space will be developed at a prominent location at heart of City, where a 40 years old outdated building currently sits. The building is to be fully demolished except for the basement retaining walls and piles. Adjacent City Tower terrace is to be partially demolished to allow for the extended City Place House development. It will be designed for flexibility and multi tenancies and provide 325,000 sq ft of commercial net area.

Project information

Status

Proposed

Borough

City of London

Estimated completion

August 2025


Location

55 Basinghall St, London EC2V 5DX, UK


Team Credits

Architect

Allies and Morrison

MEP, Lift and BREEAM Consultant

Sweco

Structural Engineer

Arup

Facade Engineer

Arup

Fire Consultant

Arup

Cost Consultant

Gardiner & Theobald LLP

Project Manager

Cogent

Planning Consultant

DP9 Ltd

Transport Consultant

TPP

Townscape Consultant

Robert Travernor

Verified views

MillerHare

Access and Inclusion

David Bonnet

Acoustic Consultant

Sweco

Landscape Architect

Townshend

Approved Inspector

MLM


Last updated on

30/11/2020


Stay in touch

Upgrade your plan

Choose the right membership for your business

Billing type:
All prices exclude VAT
View options for Personal membership