Under Construction
Stiff + Trevillion
The adaptive reuse of Finsbury Dials involved reconfiguring the existing accommodation, whilst retaining the existing structure and reusing on-site/reclaimed materials where possible.
The adaptive reuse of Finsbury Dials involved retaining the existing structure & reusing on-site/reclaimed materials where possible. Crushed granite façades were re-purposed into terrazzo tiles & lightweight CLT infill panels enabled the reuse of the existing frame & foundations. The design targets an upfront embodied carbon <301 kgCO2e/m2, BREEAM Outstanding, WELL Platinum, & NABERS Design for Performance 5* target.
Project information
Status
Under Construction
Borough
Islington
Estimated completion
October 2025
Location
20 Finsbury St, London, UK
Team Credits
Client
Greycoat Real Estate and Goldman Sachs Asset Management
Architect
Stiff + Trevillion
Structural Engineer
Waterman Group
Mechanical Engineer
Cundall
Electrical Engineer
Cundall
Sustainability Consultant
Cundall
Listed by
Last updated on
17/03/2025