Finsbury Dials

Under Construction

The adaptive reuse of Finsbury Dials involved reconfiguring the existing accommodation, whilst retaining the existing structure and reusing on-site/reclaimed materials where possible.

The adaptive reuse of Finsbury Dials involved retaining the existing structure & reusing on-site/reclaimed materials where possible. Crushed granite façades were re-purposed into terrazzo tiles & lightweight CLT infill panels enabled the reuse of the existing frame & foundations. The design targets an upfront embodied carbon <301 kgCO2e/m2, BREEAM Outstanding, WELL Platinum, & NABERS Design for Performance 5* target.


Project information

Status

Under Construction

Borough

Islington

Estimated completion

October 2025


Location

20 Finsbury St, London, UK


Team Credits

Client

Greycoat Real Estate and Goldman Sachs Asset Management

Architect

Stiff + Trevillion

Structural Engineer

Waterman Group

Mechanical Engineer

Cundall

Electrical Engineer

Cundall

Sustainability Consultant

Cundall


Listed by

Cundall

Last updated on

17/03/2025