Built

A repeatable and cost-effective approach to providing adaptable, healthy and low-carbon workspaces.

A repeatable and cost-effective approach to providing adaptable, healthy and low-carbon workspaces.

The refurbishment prioritised low embodied carbon materials, local supply and reuse of existing materials where possible – carpets, ceiling tiles, lighting fixtures and timber partition studs - and the refurbishment of existing furniture. Taking a ‘long-life, loose-fit’ approach to fit-out allows the buildings to adapt to market-demand and alternative future uses. We calculated a saving of 31,768kgCO2e - a 34% reduction in lifecycle embodied carbon for the refurbished items.


Project information

Status

Built

Borough

* N/A Outside of London

Size

1350 sq m

Completion

February 2022


Location

Bucknalls Ln, Watford WD25, UK


Team Credits

Client

Building Research Establishment ( BRE)

Quantity Surveyor

Gardiner & Theobald LLP

M&E / Sustainability Engineer

Cundall

Structural Engineer

Alan Baxter

Project Manager

Steam

Fire Consultant

The Fire Surgery

Contractor

Logan Construction


Listed by

Feilden Clegg Bradley Studios

Last updated on

31/05/2024