New London Architecture

TEDI-London Modular Campus

Built

The overall campus has been designed around four buildings which may be delivered over several phases as space is required for education and life sciences.

Two new buildings are provided on the Canada Water Masterplan for TEDI-London’s University campus, and life sciences purposes.

The off-site manufactured, volumetric modular structure allowed rapid on-site assembly, lower vehicle movements, zero waste-to-landfill with decreased noise, dust and disruption to neighbours.

The second phase utilised pre-loved modules, wall and window components. The buildings are built for intermediary use before disassembly to continue their life elsewhere. The entire front gate is made from 100% recycled steel – salvaged from the Printworks site adjacent.


Project information

Status

Built

Borough

Southwark

Size

7300 sq m

Estimated completion

August 2001


Location

Canada Water, London SE16 7LL, UK


Team Credits

Client

British Land

Contractor

Galldris

Contractor

Premier Modular


Last updated on

31/05/2024


Stay in touch

Upgrade your plan

Choose the right membership for your business

Billing type:
All prices exclude VAT
View options for Personal membership