New London Architecture

UCL Multi Lab

Planning Granted

Turner Works have given a second life to a modular lab building and provided a mixture of research spaces in the Olympic Park for the growing UCL East campus.

UCL East Multi Lab temporarily relocates a modular lab from Bloomsbury to UCL East. A surrounding ‘mini-campus’ includes a Bee Lab, vertical farms, and a greenhouse. Turner Works unifies these prefabricated structures with yellow colour drenching and an aluminium mesh façade inspired by cellular structures, creating a dynamic research space that connects UCL’s vision with the community.


Project information

Status

Planning Granted

Borough

Newham

Size

542 sq m

Completion

September 2025


Location

London Aquatics Centre (Stop J), London E20 2AQ, UK


Team Credits

Project Manager

Turner & Townsend

MEP

BDP

Structural Engineer

Wilde Consulting Engineers

Planning Consultant

Deloitte

Quantity Surveyor

AECOM


Listed by

Turner Works

Last updated on

20/03/2025


Stay in touch

Upgrade your plan

Choose the right membership for your business

Billing type:
All prices exclude VAT

Small Business Membership

Medium Business Membership

Large Business Membership

View options for Personal membership