Built
FaulknerBrowns
Woolwich Waves is a landmark leisure destination in London, designed as part of a health-led masterplan to inspire healthier lifestyles and provide inclusive space for community and culture.
Conceived as part of a health-led masterplan, Woolwich Waves transforms an under-used town centre site into a civic hub for wellbeing in south-east London. Co-created with local communities, it brings together swimming, sport, wellbeing and cultural spaces under one roof, alongside new facilities for the neighbouring Tramshed Theatre. The ambition was to encourage active living, regenerative growth and shared experiences across diverse communities. Developed for the Royal Borough of Greenwich, the project rethinks the leisure centre as inclusive civic infrastructure, combining sport, culture and community uses to increase participation and improve public health. Situated within the Woolwich Conservation Area, the scheme responds to a dense urban setting and heritage context with a compact, vertically stacked design. This maximises site efficiency, frees up ground-level space for public realm and establishes a cohesive frontage to General Gordon Square, mediating between surrounding historic buildings through a carefully calibrated material palette. The 11,894m² building integrates a 25m pool, leisure pool, sports hall, fitness suites and community spaces, with a direct link to the refurbished theatre. Inclusivity shaped both process and outcome: working with disability and dementia groups, the Sikh community and Unheard Voice informed step-free access, sensory lighting and improved changing provision. Public spaces, including the foyer and café, act as a ‘community living room’, encouraging informal use and social connection. Woolwich Waves sets a new benchmark, achieving BREEAM Outstanding. Early impact is strong, with up to 4,000 daily visits and a 40% membership growth within ten weeks of opening. By reducing barriers to participation and embedding social value, it positions health and wellbeing at the heart of Woolwich’s regeneration.
Project information
Status
Built
Borough
Greenwich
Size
11894 sq m
Estimated completion
December 2025
Location
51 Woolwich New Rd, London SE18 6ES, UK
Team Credits
Architect
FaulknerBrowns
Client
Royal Borough of Greenwich
Project Manager
Hadron
Structural Engineer
Buro Happold
M&E / Sustainability Engineer
VZDV (Van Zyl & de Villiers)
Quantity Surveyor
Gleeds
Contractor
Morgan Sindall
Planning Consultant
Tibbalds Planning and Urban Design
Landscape Architect
LDA Design
Listed by
Last updated on
16/11/2026
Small Business Membership
Medium Business Membership